Fulfillment of increased vibration control requirements
Requirements
- Large-scale layout of a system substructure below the deck to create a basis for simplified mounting of systems without time-consuming installation of individual brackets.
- This project had higher sound-proofing requirements; all systems had to be attached with acoustic decoupling.
Implementation
- The combination of the MPR-Support channels with our Dämmgulast pads and Dämmgulast pipe clamp linings created a stable system substructure with acoustic decoupling, which could be used for mounting all systems.
- We provided support for the construction with weld and support channel layout plans and bills of materials.